Jump to content

BECC

Cuijk, North Brabant, 10 MW / 20 MWh

IMG_5952
Research
Preparation
contracting
Realization
Operational

Energy storage / Bio-Energy Plant Cuijk (BECC)

The owners of the BECC aim to add more flexibility to their power plant, so we are helping them integrate an electric boiler and a large-scale energy storage system. The EOS has a capacity of 10 MW and a storage capacity of 20 MWh and is being built adjacent to the power plant.